M8 motorway (Hungary)

Template: Infobox trunk road / Maintenance / HU -M

Megyek ( counties ):

  • Vas
  • Veszprém
  • Fejér
  • Bács -Kiskun
  • Plague
  • Jász -Nagykun -Szolnok

Autópálya M8 (Hungarian for, M8 motorway ' ) proposed in west-east direction and partially under construction motorway in Hungary and part of the European Route 66 is It starts in western Hungary on the border with Austria and runs eastwards past Veszprém, Dunaújváros and ends at Szolnok. 10 km have been completed, also other parts on one or two tracks that are not yet posted as M8.

In Austria it is continued in the planned S7 Fürstenfelder highway towards Graz.

Motorway junction M4 -M8

To the north of Szolnok the motorway junction M4 and M8 is planned. These nodes in M4 motorway 91 000 to 96 055 km and with M8 motorway 0 000-4 000 km length section as a 2x2- lane highway was to be built from 2014.

Körmend - Szentgotthárd -S7

M8 motorway west section located in Vas county, and is taken from Körmend to border at Szentgotthárd. In 2006, was planned as previous 3 lines Varienaten. In 2012, the Environmental Impact Assessment has finished, and then in February 2013, permission was granted. From this time there is only one road variant comparison. End of 2013, the planning of the building permit and the implementation plan was initiated. Construction is from 2014-2015 and to expect the entire 28.3 km length range. The road becomes a four - lane expressway that can develop later supplemented to full highways. The Longest Talübergang - Length: 500 m - will be built north of Vasszentmihály over the valley and Reiner Strasse. About Pinka and Natura 2000 area should have a length of 200 m bridge to be built.

In Körmend District: Horvátnádalja should north of the West Hungarian web are broken down into single-family homes and a 4 m Höche noise barrier to be built.

91874
de