HSL 2

The HSL 2 ( Dutch: Hogesnelheidslijn 2, French: Ligne à grande LGV 2 or vitesse 2) is a 95 km long Belgian high-speed line between Brussels and Liège. The HSL 2 is currently operated by Thalys, from the ICE and Intercity trains. The maximum speed limit on the route is a maximum of 300 km / h

Course

Between Brussels and Leuven follows the route of the existing route, which was expanded to four tracks in this area. The middle two tracks serve the high-speed traffic, the outer two tracks the other traffic. Between Lions and Liege follows here is designed as a new line -speed rail in transport infrastructure bundling the course of the E 40 motorway until shortly before Liege. These roads bundling emerged from a requirement of the approval authority as part of the route planning.

The new railway line between lions and Bierset (about 10 km west of Liege ) measures 62 km. The only engineering structure in this section is a 750 m long tunnel to the passage of a village.

Ans When the new line goes into the double track inventory Brussels- Liege.

HSL 2 at Berloz ( A3/E40 )

The maximum longitudinal slope of the new line is 21.58 per thousand. In 300-km/h-Abschnitt the minimum curve radius is 4650 m, at an elevation of up to 130 mm.

History

After an agreement of the Minister of Transport involved in the project PBKA the Brussels -Aachen section should be completed in 1998. In the spring of 1998, construction began on the new line. January 11, 2001, died in the collision of two work trains and a driver. Four locomotives and ten cars were causing irreparable damage and scrapped on site.

The company was incorporated in 2002. Due to lack of approval for the route, the newly inserted the timetable change in December 2002 ICE 3 ICE International perverted over the existing track. On trial runs of an ICE 3M on the track on October 28, 2003 Gravel flight was observed. The critical speed later 275 km / h was determined and the trains allowed on the course for 250 km / h.

Since the completion of construction of the HSL 3 end of 2007 a ​​continuous Belgian East-West axis from the French border ( with TGV service to Lille and Paris and Euro Star train to London ) exists to the German border. The commercial operation on the HSL 3 was delayed by lack of technical equipment of the ICE and Thalys trains to mid- 2009.

Technology

Along the entire route are provided with two track change a distance of 29 km.

The new line is electrified with 25 kV / 50 Hz alternating current, the existing line with 3000 V DC. As a train control system is used on the new line TBL 2/3.

On the existing line is located in the exit of the train station of Liège, direction Brussels, a slope of 35 ‰.