ISS Propulsion Module

An ISS Propulsion Module ( IPM, Eng. , About ISS drive module) was intended as a replacement solution for the Zvezda module of the International Space Station and the Progress cargo. Initially, only the Russian Zvezda module and Progress and from 2008 also the European Automated Transfer Vehicle used for important functions such as positioning, navigation, control and drive. If the Zvezda module would have been lost at the start or the start would be delayed, the IPM would have been used. Thus, the ISS could regulate their altitude and position, possessed a fuel tank and had an approaching space junk can dodge. Before the use of IPM, however, the Interim Control Module was first started, but that only has a maximum maturity of three years.

The ISS needs each year an average of 7000 kg of fuel to hold the altitude, for evasive action and to hold the position. You will need to 2014 about 105,000 kg of fuel.

An IPM could provide fuel reserve for available for one year, if the supply would break. An IPM would have docked at the end of the ISS.

There are several supply vehicles required to cover the average 7000 kg fuel requirements of ISS per year. However, the current schedule of six Progress- M1 spacecraft per year covers the need.

The IPM would take approximately 9808 kg of fuel. In comparison, a Progress- M- 1200 kg and a Progress- M1 spacecraft take 1950 kg of fuel. The Automated Transfer Vehicle ESA summarizes 4700 kg and not for the use Come ICM would have taken 5000 kg fuel. With the Space Shuttle, the height of the ISS is typically lifted 232 kg of propellant, maximum, depending on the mission as well as with up to 1626 kg. The Zarya module of the ISS summarizes 5500 kg and the Zvezda service module holds 860 kg of fuel, however, the system will attempt to keep the main engines of both modules as a reserve, as these have a limited life.

The IPM was provided in addition to the use as a replacement for the ISS Zvezda module as its own, American drive way and would later complete the ISS. However, there were cost overruns and delays in planning. An alternative design of the " Node X" design, intended to use an inappropriate fabricated hull, which was scheduled for the Harmony or the Tranquility module, has been proposed and considered provisionally in the planning process. In this case, two removable fuel tanks should be used which would have been transported by a space shuttle. The replacement of the tanks would have avoided problems when pumping fuel between tanks in space. It was later deleted from the plans, instead, the ISS must relate to the driving of ATV and Progress leave. In addition, as part of the decommissioning of the shuttles a further reorganization would have been necessary.

Zarya · Unity · PMA · Zvezda · Integrated Truss Structure · Destiny · ESP · Mobile Servicing System · Canadarm2 Quest · · · Pirs Strela · Harmony · Columbus · Kibo · Canada · Hand Poisk · ELC - 1, 2, 3 & 4 · · Tranquility Cupola Rassvet · · · PMM Leonardo Alpha magnetic Spectrometer

Yet to be launched modules: Nauka · ERA · SPM

Coated modules: CAM · Habitation Modules · ICM · · IPM Research Modules · SPP UDM · · DSM · MPM · Enterprise Crew Return Vehicle