Neuwied station

  • Rights Rhine line (km 135.8 )
  • Railway Neuwied Koblenz ( 0.1 km )

I7i12i13i15i16i16i18i20

The train station is next to the Neuwied Engers station of the train and one of the hubs of public transport of the city of Neuwied in Rhineland-Palatinate and is located in the west. The station is located on the right bank and is starting point of the railway line Neuwied Koblenz. At the station forecourt there is a bus station.

History

As in 1857, the Left Rhine line was opened, there was a station called Neuwied in Weissenthurm. The ferry service between Neuwied and white tower was carried out in 1860 by the railway company.

The current station was Neuwied, so opened at the same time in 1869, right- Rhine line. In the early years, especially after the opening of Westerwaldbahn (1884), however, the Engers Neuwied station was more important than the train station. It was only after the construction of Crown Prince Wilhelm Bridge ( predecessor of today's Urmitzer railway bridge) between Passengers and Urmitz and the opening of the railway line Neuwied Koblenz in 1918 won the station in importance, especially after the suspension of operations at the Westerwaldbahn.

On 22 December 1947, near the makeshift Wiedbrücke in Neuwied a serious railway accident when two express trains, which came D 269 and D 48 together occurred. 42 people died and 116 were injured.

In early October 2011, the first phase of construction for the modernization of the railway station was completed in Neuwied. As part of the construction phase the platforms with two elevators were accessible accessible accessible. In addition, the staircases have been renewed and in the underpass new wall and floor coverings were installed with integrated blind control system. 2 and 3 was increased in the region of the lift of the middle platform of the tracks, the platform edge at 55 cm and in need of renovation roof replaced by a modern roof in preparation for the second construction phase. Dynamic changing of font indicators were also established. This conversion cost 1.7 million euros, which were paid out of the stimulus package. Under a second phase the renewal and increase of the home - and middle platform is provided. The modernization of the travel center in the train station was completed in December 2012. These measures cost 60,000 euros.

Construction

The Neuwied station has a freight and a passenger area.

Freight yard

The freight station Neuwied operatively integrated into the Neuwied station, has two loading tracks with a total Ladestraße of 1,827 square meters. The loading of wagons can be carried out exclusively through the loading point, further is electrified only one of the two Verladegleise.

Passenger station

The passenger traffic is handled in the Neuwied station on two platforms with four platform edges ( three through tracks and a railway siding ).

The Neuwied station is serviced by 2012 only two trains of long-distance passenger traffic. These are also the only train that runs only on the right track and not run up the Rhine and Koblenz Main Station.

In rail transport of Neuwied Station of the following transport lines since December 2010 served:

Others

A significant appreciation of the station and its surroundings was accompanied by the complete redesign of the station forecourt. As part of this redesign was

  • Renewed the bus station and converted to eleven holding bays (additional twelve Bus were created ),
  • A bicycle shed built,
  • Created 100 Park & ​​Ride spaces.
98805
de