The Oberbergische train runs in forward movement of the S -Bahn Rhein-Sieg as a regional train RB 25 (in future: S 14) from Cologne Hansa ring Meinerzhagen.

DB Regio NRW is this a diesel railcar VT 644 series in double and triple traction.

Route

The RB 25 starts in Cologne Hansa ring and performs on the tracks of the S- Bahn route of the railway track Cologne-Kalk - Overath, in Overath then the railway track Siegburg - Olpe (also called " Agger train "), and on which it is to Dieringhausen drives, from there it goes to the Volmetal car to endpoint Meinerzhagen.

The RB 25 runs in the section between Cologne Hansa ring and angels churches every half hour ( in rush hours to Gummersbach ). Hourly trains run on Overath addition to Meinerzhagen.

Tariff

On the entire route of the tariff of the transport association Rhein-Sieg applies.

Future

Further future

The section between Cologne Hansa ring and Overath should be driven in the future in 20 -minute intervals. This, however, is a double-track lines is necessary. The line should be 2015 integrated into the network of S -Bahn Rhein-Sieg and continue over Cologne addition to the Eifel.

Furthermore, there are plans, the Meinerzhagen Section <- > Bruges ( Westphalia ) to reactivate the Volmetal web. This could go without changing direction until Lüdenscheid the trains from Cologne.

Through the former NRW Transport Minister Oliver Wittke (CDU), the reactivation of the entire section in 2005 has been denied. The timetable change in December 2013, the section Marie Heath Meinerzhagen again went into operation, to February 26, 2014 Schienenersatzverkehr.

Award to DB Regio Rheinland

The competent transport authorities had awarded in March 2011 the Cologne Diesel Power to the DB Regio Rheinland for operation from December 2013 for 20 years. Under this award, the following measures on the Oberbergi track were provided and already partly implemented:

  • Line extension (reactivation) about Marie Heath addition to Meinerzhagen
  • Deleted Gummersbach ( Would - double track expansion in the area Dieringhausen
  • Speed-increasing measures in the section Porz to Rösrath
  • Expansion of the range ride in the section Overath - Angel churches by lengthening the trains between Cologne - Overath (thirteen journeys Mon-Fri)
  • Expansion of the range ride in the section Overath - Gummersbach to fourteen journeys Mon-Fri
  • HVZ additional amplifier in the morning peak of Overath ( 7:11 clock ) to Cologne ( 7:48 clock )
  • Establishment of a half hourly service between Marie Heath and Gummersbach 7:00 to 8:00 clock for the student and school transport

As a vehicle Alstom Coradia LINT 54 and 81 used.

Work at the stations

Since the beginning of October 2012 ran extensive work in the area of ​​the station Meinerzhagen. For the reactivation of the passenger traffic in December 2013, the section between Marie Heath and Meinerzhagen the old railway tracks were torn down and built two new rail tracks and three points for rail traffic. By the end of November 2012, there were also later in the Volmestrecke behind Kierspe towards Oberbrügge finishing works. The German Bahn AG invested in this track renewal approximately 16.5 million. Further measures also expanding and securing crossings as well as the redevelopment of the breakpoints in Meinerzhagen and Kierspe would still be present. Be it to 2015/2016 again able to offer a seamless passenger regional rail route 25 ( Oberbergische train) from Cologne to Lüdenscheid The goal.

The reactivation of the Volmetal web is a major project within the regional program " Top of the Volme ". In addition to the track work, carried out by the German Bahn AG, make the four participating municipalities Meinerzhagen, Kierspe, Halver and Schalksmuehle also the environment around the stations more attractive. In addition, the stations will also support stations with parking facilities for the likewise belonging to the Regional Project Volmetal bike path.

In Meinerzhagen and Kierspe the two central bus stations (ZOB ) to be redesigned in this context. They should serve the link between rail and bus. The Meinerzhagen station to station as the Kierspe have two tracks. There has been running since the beginning of October 2012, the dismantling of the old tracks, which still had partially railway sleepers of wood. In parallel, the two new rail tracks are laid in modern vinification techniques. Be fitted to three points: two in the area before the tunnel where the serving for freight services to Krummenerl side road branches off and then at the third exit towards Kierspe.

Further extension to Lüdenscheid

The purpose transport association Westfalen -Lippe ( NWL ) intended as PTAs, the extension of the RB 25 on the reactivated route Meinerzhagen - to forgive Lüdenscheid the timetable change 2015/2016 directly to make a continuous connection from Lüdenscheid to Cologne. The award procedure is expected on March 31, 2014 [ deprecated] begin.

According to a press release of the German railway in February 2014, the planned start of the reactivated distance can not be maintained as of December 2015.