RER D
The RER D is one of the most important north -south connections to the Paris suburb of transport in the Ile- de -France region. It connects to the north Orry- la- Ville- Coye (D1) and Creil (D3 ) with Melun (D2) and Malesherbes (D4 ) in the south. She crosses the city and meets important nodes such as the Gare du Nord, the Gare de Lyon and the central interchange station Châtelet - Les Halles.
The D line is 160 km long, some of their breakpoints, about Malesherbes in the south and all stations north of Survilliers - Fosses are already outside Paris tariff system. It is fully operated by the SNCF.
- 2.2.1 Northern line
- 2.2.2 South Range
History
Route
Survey
Northern branch
North of the capital, the line of Villeneuve -Saint -Georges runs from north past the Stade de France and the city of Saint- Denis. In Orry- la- Ville- Coye finally ends the main branch D1. This is followed by the route Creil (D3 ) follows, although actually has low ridership, but is still served by the line D.
Paris
Initially, the line divides D from the Gare du Nord to Châtelet - Les Halles a tunnel with the RER line B. This leads to major problems and requires at peak times daily logistical feats. She then runs parallel to the RER line A to Gare de Lyon. Then the line runs first right of the Seine until it divides into the station Villeneuve -Saint -Georges.
Southern branches
D 2 Melun on Brunoy: On the one now performs a branch via Brunoy and Lieusaint - Moissy to Melun.
D 4 Malesherbes / D 6 Corbeil -Essonnes: The other road leads over Juvisy, interchange station for Line C, to Viry -Châtillon where again held a ramification: D 6 as the line over to Evry Corbeil -Essonnes runs. On another route via Orangis - Bois de l' Epine, the line reaches 4 D also Corbeil -Essonnes, from where it continues towards Malesherbes. From Corbeil -Essonnes a line branches off from Melun, but not part of the RER network.
Breakpoints
North route
(D 3)
- Creil
- Chantilly - Gouvieux
- Orry- la -Ville
(D 1)
- Orry- la -Ville
- La Blanche Borne
- Survilliers - Fosses
- Louvres
- Les Noues
- Goussainville
- Villiers -le- Bel - Gonesse - Arnouville
- Garges - Sarcelles T T5
- Pierrefitte - Stains
- Saint- Denis T T1
- Stade de France - Saint- Denis
- Gare du Nord RER B E M 02 04 05
- Châtelet Les Halles RER A B M 01 04 07 11 14
- Gare de Lyon RER A M 01 14
- Maisons- Alfort Alfortville
- Le Vert de Maisons
- Villeneuve - Prairie
- Villeneuve - Triage
- Villeneuve -Saint -Georges
South Range
(D 2) - Melun
- Villeneuve -Saint -Georges
- Montgeron - Crosne
- Yerres
- Brunoy
- Boussy -Saint -Antoine
- Combs- la -Ville - Quincy
- Lieusaint - Moissy
- Savigny- le- Temple - Nandy
- Cesson
- Le MÃ ©
- Melun
(D 4) - Malesherbes
- Villeneuve -Saint -Georges
- Vigneux -sur -Seine
- Juvisy -sur -Orge RER C
- Viry -Châtillon
- Grigny - Centre
- Orangis - Bois de l' Epine
- Evry - Courcouronnes
- Le -Bras -de -Fer - Evry - Génopôle
- Corbeil -Essonnes
- Moulin -Galant
- Mennecy
- Balla Court
- La Ferté- Alais
- Boutigny
- Maisse
- Buno - Gironville
- Boigneville
- Malesherbes
(D 6) - Corbeil -Essonnes
- Villeneuve -Saint -Georges
- Vigneux -sur -Seine
- Juvisy -sur -Orge RER C
- Viry -Châtillon
- Ris -Orangis
- Le Grand Bourg
- Evry
- Corbeil -Essonnes
Trains name
The Paris RER trains the goal of the respective train is indicated by four letters, which shall each give a name (eg VICK ). Each potential terminus has its own letter, the first letter of the name displayed is thus the badge of the railhead.
- A = Gare du Nord
- B = Malesherbes; distance D4
- C = Creil
- D = Gare de Lyon
- F = Goussainville
- H = Orry la Ville - Coye; distance D1
- J = Juvisy
- Q = Villeneuve - Saint -Georges
- R = Corbeil -Essonnes
- T = La Ferte - Alais
- U = Stade de France
- V = Villiers -Le -Bel
- Z = Melun; distance D2
Again, the letters clearly. The train " BIPA " goes to Malesherbes, train " VICK " to Villiers -le- Bel on the line D1 in the direction Orry.
Future
Because of the restrictions imposed by the common use of tunnel in the center of Paris is the line D often at the limit of their capacity, and also the problems with punctuality are enormous. Therefore, for a long time to build a second tunnel between Gare du Nord and Châtelet - Les Halles thought, possibly with the result of the establishment of a new branch in the north.
The Pierrefitte station - Stains should be removed for crossing station with the planned Tangential North.