Brügge (Westfalen) station

  • Volmetal train ( KBS 434, 459 )
  • Bruges Lüdenscheid ( KBS 434 )

I7i12i13i15i16i16i18i20

The Bruges ( Westphalia ) station is a station on the railway Volmetal from Hagen to Dieringhausen and is used by DB Station & Service performed in the lowest station category 7. Because of the branch of the railway line to Lüdenscheid he is a separation station. The station is located on the edge of the hamlet Lüdenscheider Bruges. The only platform extends up to the bus stop and is at ground level. Nationally known is the rider Interlocking of the station.

History

The Volmetal train from Hagen to to Dieringhausen opened in 1871-1893. Around the station area created numerous apartments for the Railwaymen because Bruges ( Westphalia ) had a high importance in rail traffic and many residents were employed in the station operation. For these times also originates nor the rider Interlocking, also there was a roundhouse with a turntable and a private water tower on the site. Until 1986 there was a direct connection to Cologne in passenger, the 2013 expected to be between Marie Heath and Meinerzhagen and later ( December 2016 ) to Bruges ( Westphalia ) is to be reactivated. 2009, the former decorated in an Art Nouveau station building was demolished because of the danger of collapse, because there had been no restoration of the old building in recent years.

The platform of the station facilities Bruges still exist partially, but have also been partially dismantled. Previously, the platform facilities were connected for the route of Dieringhausen and Cologne via an underground passage to the station forecourt. Freight transport in Bruges is limited to the coming of the route to Krummenerl freight trains of the local quarry, which continue on the path through Volmetal Bruges to the north. According to the city council and the mayor Dieter Lüdenscheid Dzewas it is planned to build an island platform with two platform tracks in Bruges, which should be at ground level. However, this plan will only be put into effect when the closure of the gap between train Volmetal Marie Heath or Meinerzhagen and Bruges ( Westphalia ) is complete. A result, many students would have the opportunity schools, colleges and other educational institutions in the area to visit or come to Lüdenscheid to visit them. The attractiveness of the region would rise and could halt the population decline in the coming years. Therefore it is important, according to Dieter Dzewas further for obtaining the distance between Meinerzhagen and Bruges ( Westphalia ) to fight and to find an investor for the track, which makes the route for passenger trains again passable.

The facade and roof of the old railway signal box on the tab Bruges train station, which dates back to 1927, are currently being renovated. This was announced by a spokeswoman for Deutsche Bahn on July 2, 2012, the newspaper " Lüdenscheider News " with. Thus, the defining building of the former railway junction would receive a boost.

On 31 January 2013, a report in the Lüdenscheider news appeared that the new proposed 120 m long central platform at the station Bruges ( Westphalia ) was too short according to a rule. In contrast defend themselves according to the newspaper now the German Bahn AG and the city Lüdenscheid. The new platform should be between railroads Lüdenscheid - Cologne and Bruges -Hagen. Incoming passengers could there either on the same platform change to the opposite train or use a transition that would lead to bus stops, taxi parks or parking lots on the edge of the tracks. If the new platform instead of 120 m 170 m would be according to the rule now, you could solve the transition between the platform and the road only with a bridge like on Meinerzhagen station. Otherwise, the passengers came out according to the newspaper in the rear area of the planned new fire station. The city Lüdenscheid would like this if it is possible to avoid by a shorter platform.

On 20 March 2013, a further report in the Lüdenscheider news appeared that the future is 80 meters long planned platform in Brugge will be but longer now. However, the platform should not be extended to the desired country from the Department of Transportation standard of 170 meters, but only up to 120 meters. The promise was given for the Municipality of Lüdenscheid now by Deutsche Bahn, and especially this commitment was important for the city Lüdenscheid. The trains are maintained parallel to the platform in order to keep the transfer from the Cologne train to Hagen as short as possible. After Lüdenscheid the route should, however, result directly. The place to wait for the buses and taxis currently have, but it should still remain directly accessible. The city Lüdenscheid hopes that her previous targets will be also approved. Thus, passengers are from the platform directly to the approximately 5,000 -square-foot space with serviceable MVG buses, taxis or private greeters ( Kiss & Ride) can reach. Dignity of the platform, however, be too long, he would end up on the future site of the fire department. Thus, the passengers would almost landing in the back of the new fire station. However, the Ministry is to hold still closed. The same is true according to the city Lüdenscheid for the Federal Railway Authority, which has to decide whether it is for a formal or Bruges - should give abbreviated plan approval process - as desired.

In addition, there should be a direct train from Lüdenscheid to Cologne from 2015, when the recently again confirmed plan data is held until 2015. The future train station Bruges ( Westphalia ) is then to be upgraded as a transportation hub. For example, for all passengers who want from Cologne to Dortmund Hagen or: You could then in Bruges by train to change to train and continue immediately, because the trains are at the same time waiting on both sides of the new platform. Among the positive effects of future lines for Lüdenscheid then counted also, that the mountain city of Cologne will be reached without transition. Bruges train station ( Westphalia ) will, however, interesting for all passengers from the south, which could continue from here on the bus. Which brings up the question arises whether, in view of the expected frequencies would be to think of a kiosk. Lt.. the city Lüdenscheid is this not yet been scheduled but quite conceivable. The road that runs along the Volme to be " On Brugge Train Station " named as, soon. No precise information admit it still about how long you 'll be in the regional Ludenscheid to Cologne actually go. Good 90 minutes it should, as measured by comparable routes, but his. Be unclear yet whether the German railway will even serve this route or if here any other provider comes into play. The city administration Lüdenscheid go according to the report assumes that the schedule would be kept, also independent of will choose which method to planning approval, the Federal Railway Authority. The previous information to loud that the question "formal or shortened " in the method have no effect on: Still in 2015, according to the report should roll the first train.

Station area

Planning

On the former site of the goods station are now a furniture store and a timber merchant. In addition to a new supermarket or full-range (consumer market ), a market for animal feed, a bottle shop and a bed and mattress arise dealer. This would require the premises of the station of contaminated sites are freed and the two existing retailers would have to move to another site. The development of the new area will be via a bridge over the Volme that would make the 229 existing T- intersection of B 54 and B for the full four-way intersection. In the future, this bridge is to be used for a bypass of Bruges on the Wahrdeabstieg.

2010

On top of that on the site since 2010, a new fire station to be built because the old fire station in Winkhausen is already strong in need of rehabilitation. Against the development of the site at the Bruges train station the train is grinding Kotte GmbH, as this allows the last Güterverladestelle would overbuilt in Volmetal. The city Lüdenscheid commented that she is primarily to improve the supply situation in the districts of Bruges and support Ting Hausen and this takes precedence over economic interests of a private rail freight operator.

2011

On November 26, 2011, by the newspaper " Lüdenscheider News " announced that the city administration had sent Lüdenscheid contract works to the Hamburg investment company Procom for signature. The company Procom have already explained at the beginning that she wanted to settle in Bruges Ost 12000 square meters between the track and the Volme shops for food, beverage, mattresses and pet supplies. According to this newspaper was in the non-public part of the recent planning committee meeting announced that the management to the external question, whether it is waiting to come to the financial statements for the ten- million - euro project.

2012

11 May 2012 it was announced that the Hamburg investment and holding company Procom has withdrawn from the project before -sign contracts. The project has been subsequently re-tendered. Overall, it is about 11 800 square meter building plus 3,500 square feet for the public opening of the surfaces. After re- tendering, there are again new prospective for the acquisition and development of the former railway property opposite the petrol station Klapperich. The planning content now includes a full-line supermarket than 2000 m², including 400 m² beverage market, two stores for Zoo and beds, an alternative to a specialized market, a financial institution or a motor vehicle operation. In addition, the candidate must build the bridge over the Volme and adjust the crossover for B 229 / B 54.

On August 29, 2012, the Committee met for Urban Planning and Environment of the City Lüdenscheid in the Council Chamber publicly proposed resolution to the preparation of the development plan " Bruges -West". In the area around the former station building demolished and there will also be areas for linking bus and rail as the Lüdenscheider station next to the newly built fire station Bruges. This should be supplemented by land for park and ride, bike and ride and kiss and ride. The areas for would now be much larger than originally planned. This consequence of the fact that the Bruges train station ( Westphalia ) 'm connected in 2-3 years ( 2014-2015 ) to the rail to Meinerzhagen. This paved the way for the railway route from reactivation of Bruges about Marie Heath to Cologne would be free. Thus, significantly more passengers could be expected and that would bring the increased land use at the Bruges train station with them. In addition to a foot and cycle path will be built on the site according to the Bruges - West development plan, and also there will be plantings along the Volme and a 70 speed limit on this section of the Volmestraße (B 229 / B 54).

The dilapidated bridge in Bruges - East should be according to a report in the newspaper " Lüdenscheider News " also replaced on 20 November 2012. As part of the development of the building area of Bruges -east, the building is ( already " go missing " is, according to the city council and no longer allowed to enter ) to be demolished - and make way for a new bridge. However, the date is uncertain, because the city still looking for a buyer for the site. The tender for the site would run according to the press office of the city Lüdenscheid. There are a supermarket on the site (full range ) occur with attached beverage market as well as two professional markets.

2013

On March 21, 2013 was the newspaper " Lüdenscheider News " announced that in the summer of next year, the fire company Bruges is due to move into its new fire station at the station. The building permit for the new fire station was according to the Municipality of Lüdenscheid already been issued, the work for the two million Euro building is scheduled to begin in May 2013 - will soon become a large construction sign at the station Bruges ( Westphalia ) testify to this. Until the end of 2013, the carcass should be tight. The new fire station is projected to plans are structurally divided into three parts to the vehicle garage and hall to a changing room and service area and a training room for free. The vehicle garage and the training room to be executed in reinforced concrete construction, the two-storey changing rooms and service area are executed in masonry. To be pent-roof structures are the roofs for garage and training room according to the city government, while the central building with sloping roofs are planned in the tent roof. In addition to the new building, there will be 35 car parking areas. The total floor space in ground and first floors will be about 900 square meters, a total of about 5800 cubic feet of space be enclosed. In the vehicle hall six carports are provided for the use of vehicles delete course, a parking space should also be set up as a washing area. The locker and utilities should be made ​​according to the planning for a fire company strength of 40 to 45 people. The old building Am Kamp, who is said to have had its day in the summer of next year, is to be sold. Even as the first new building plans for the new fire station at the station were known, there were already first interested in the old fire house in the street " Am Kamp ," which would be particularly well suited for housing a craft business. The city council of the city Lüdenscheid was confident that she could market this building relatively quickly.

A new report from the Lüdenscheider News confirmed that the cost for the new fire station at the Bruges train station ( Westphalia ) should amount to 1.87 million euros. The tender for the shell lt course of the city Lüdenscheid already, by the end of the building should be created for winter.

On August 10, 2013, a report in the " Lüdenscheider news," emerged from the that the foundations for the social section of the new fire station were already installed appeared. Next, the new bottom plate is to follow. The 62 -meter-wide fire station should be structurally divided into three parts to vehicle garage and hall on the right side, a changing room and supply area in the center as well as a training room are left. The garage is to be executed in reinforced concrete, while the two-storey changing rooms and service area and the training room to be executed in masonry. The total floor space in ground and first floor should be about 900 square meters, a total of about 5800 cubic feet of space be enclosed. In the vehicle hall six carports are provided for the use of vehicles delete course. The locker and utilities to be prepared for a fire company strength of 40 to 45 people. Currently, the fire company Bruges encompasses 42 firefighters. The two million Euro building should be finished in time for the 125th anniversary of the fire engine Bruges in the summer of 2014.

Lt.. Another report of 25 October 2013, the Volme - shore between the railway overpass north of Ahelle and the river bridge at the southern end of Lüdenscheid - Bruges are fully rehabilitated. The one and a half kilometer long section of the Volme is surrounded by rows of trees that should be cut down to a large extent. For parallel B 54 towards perched so far largely a steep seawall. The riverbed should therefore be widened by four meters. With the disappearance of the trees the view of the newly planned business park Bruges East would be released more than ever before on the old site of the Bruges train station. Lt.. the city Lüdenscheid has since been bought by prolonged uncertainty this area by a consortium of investors. The new owners want there to begin construction of various stores in 2014. There to the comprehensive Baumfällungen at the Volme from the population diverse critics who fear a clearcut on the Volme. The city Lüdenscheid justified the restoration so that both the nature conservation is to be improved, as well as the position is to be relaxed at high water by the wider river bed. In the past, there were often several Volmetal floods in several places.

2014

Lt.. a report of the Lüdenscheider News of 28 February 2014, the track surface Bruges East was sold in early 2014 to a pan-European Dutch investor. The Dutch investor wants to build on the site of a full-range and two smaller stores and make the transport links to the federal highways B54 and B229, which intersect in this area. After re- European tender of the site on the B 229 / B 54 to the corresponding contracts have now been signed. Provided as stores are a pet shop and a bed store. Associated with the acquisition of the land is also the construction of the new bridge that will open up the valley crossing area and Volmestraße the terrain.

Overall, it should go to an area of ​​13,000 square meters, of which only the large consumer market will require 8,500 square meters, including various parking. Around mid-2016, the planning, the building including internal development and bridge could be completed. The currently resident on the premises businesses must now leave the area and are looking for new faces. One of the two businesses will relocate to Schalksmuehle.

Train services

The station is currently served by a regional train line:

( Mon-Sun )

The trains move in the station, the direction of travel.

Bus

A bus connections MVG ( Märkischen transport company) and BRS ( bus Ruhr-Sieg ) by the following seven bus routes:

(Mon-Fri )

(Sat )

(Sun)

Lüdenscheid, Bruges Train - Halver, east village school

Lüdenscheid, Bruges Train - Halver, savings ZOB - Wipperfuerth, bus station

Lüdenscheid, Bruges school - Lüdenscheid, Wehberg turning point

Schalksmuehle, middle - Schalksmuehle, Dahlerbrück - Hagen, Rummenohl center

Lüdenscheid, Bruges Train - Kierspe, ZOB - Meinerzhagen, station / ZOB

Lüdenscheid, Bruges Train - Kierspe, ZOB - Kierspe, fire department

Lüdenscheid, Bruges Train - Halver, savings ZOB - Radevormwald, bus station

Planning

On Saturdays and Sundays the Volmetal web is to continue one hour earlier run from Lüdenscheid to Hagen. In addition, the märkische circle for the future is aiming for a 30 - minute cycle of Volmetal track of Lüdenscheid Hagen to Dortmund, as Lüdenscheid is the highest demand maintenance.

In addition, there should be a direct train from Lüdenscheid to Cologne from 2015, when the recently again confirmed plan data is held until 2015. The future train station Bruges ( Westphalia ) is then to be upgraded as a transportation hub. For example, for all passengers who want from Cologne to Dortmund Hagen or: You could then in Bruges by train to change to train and continue immediately, because the trains are at the same time waiting on both sides of the new platform. Among the positive effects of future lines for Lüdenscheid then counted also, that the mountain city of Cologne will be reached without transition. Bruges train station ( Westphalia ) will, however, interesting for all passengers from the south, which could continue from here on the bus. No precise information admit it still about how long you 'll be in the regional Ludenscheid to Cologne actually go. Good 90 minutes it should, as measured by comparable routes, but his. Be unclear yet whether the German railway will even serve this route or if here any other provider comes into play. The city administration Lüdenscheid go according to the report assumes that the schedule would be kept, also independent of will choose which method to planning approval, the Federal Railway Authority. The previous information to loud that the question "formal or shortened " in the method have no effect on: Still in 2015 should according to the report, the first train of the Oberbergi train rolling.