Termination pylon

A final fattening is a mast to which ends a transmission line of the grid. On a finishing period, a transition from an overhead line in an underground cable will be held in the rule or it will be a pole transformer fed. Alternatively, the lines can be routed to a rail at the substation. But here is a guy portal is usually employed.

A finishing period corresponds in its design a branch mast, branches to that of an overhead line an underground cable. Occasionally such branch masts are to Endmasten after the transmission line was dismantled in one direction.

The transition from the cable to the transmission line is carried out at low and medium voltage lines on the mast, at higher voltages, sometimes in a cable garden that surrounds the finishing period.

Finishing period with transformer

Wood finishing period

Oversized final fattening phase of an in dismantling medium voltage overhead line in Stuttgart- Weilimdorf

Finishing period in Switzerland

Finishing period in Filderstadt- Bernhausen, next to the main road 27

High voltage Endmasten at the motorway junction Moenchhof near Frankfurt / Main

By function: Pylon | Abspannmast | Far Abspannmast | Verdrillmast | Junction mast | credits Portal | finishers | Pole transformer | Pole isolator

By Material: Wooden Mast | concrete poles | steel tube mast | lattice boom

On the arrangement of conductors: Portal Mast | Delta mast | A Bene mast | Danube mast | three-level pole | tons Mast | fir mast

According to site: roof rack | intersection mast

By purpose: Rail power pole | Catenary Mast | Hybrid mast | Telephone Pole | telegraph pole

  • Design ( pylon )
308043
de